Calhoun County Airport Projects


Calhoun County

Owner:
Calhoun County BOCC, Maxie Waldorf
20859 Central Avenue East
Blountstown, FL 32424
(850) 762-3713

Architect:
URS Corporation, Edgar Figueroa
7650 W Courtney Campbell Cswy
Tampa, FL 33607
(813) 286-1711

CC&D Project Team:
Project Manager: Kevin Duncan
Project Superintendent: Bo Rollins

Calhoun County Airport Projects | Calhoun County

Project Description

T-Hangar

New construction of two 13,650 sf T-Hangar Buildings.  Each T-Hangar has 12 individual hangar bays and each bay is equipped with its own hydroswing hydraulic hangar door.  The construction of each building consists of a pre-engineered structural steel frame and building system.  During this project approximately 20,000 sf of new apron was added while maintaining airport operations throughout the entire project.

AWOS System

Installation of new (AWOS) in accordance with FAA Order 6560.20 at the Calhoun County Airport.  The project was completed in three phases: mobilization, construction, and coordination, testing and commissioning with FAA as a turn-key project.   Airport operations were maintained during the complete project.

Commercial Hangar & Apron Extension

Design/Building and new construction of a 10,000 sf commercial hangar with interior shop space and installation of a 60X22 hydraulic swing door.  During this project approximately 80,000 sf of new apron was added while maintaining airport operations throughout the entire project.